Create & plan a project

A project holds everything about a job: its phases, its budget and fees, the team assigned to it, and the time and expenses logged against it. Building it out fully up front is what makes your timesheets, staffing, and reports accurate later.

Go to Projects from the main menu and click New project in the upper-right corner. Then choose how to build it:

  • Start from scratch — an empty project you’ll fill in yourself.
  • Use a template — pre-fills phases, budgets, roles, and rates from a template. On the Grow plan, Monograph also suggests team members for each role (see Role recommendations).
  • Auto-generate from contract — upload a PDF and let Monograph read the phases, budgets, and roles from it. See Auto-generate a budget from a contract.

Click Next, then enter the basics:

  1. Client — select an existing client or add a new one.

  2. Project name — what the project is called. You can change this later.

  3. Category — one or more project types (for example, Residential, Single-family). Categories power filtering and reporting later.

  4. Number (optional) and Color — a reference number and a color to identify the project.

  5. Project start date — when the project begins.

  6. Fee typeBillable (billed to a client) or Non-billable (for example, an internal project).

Click Create. Monograph opens the project’s Budget page, where you’ll add phases, budgets, and your team.

Phases break the work into stages you can plan and bill against — for example Schematic Design, Design Development, and Construction Documents. Every project needs phases: they’re what make timesheets, staffing, and reports work.

On the Budget page, use the Select a phase dropdown to add each phase. For each one, set:

  • Date range — a start and end date (required for every phase). For an ongoing phase, set the end date well into the future.
  • Linked phase — link a phase to the one before it so its dates shift automatically when the earlier phase moves. See Phases & timeline.
  • Fee typeFixed or Hourly. This affects how the phase is budgeted and invoiced; see Phases & timeline.
  • Budget — the phase’s budget as a dollar amount, or as a percent of your Service Fee. Entering one calculates the other.

For how fees roll up into your Service Fee and Total Project Fees — and how to add consultant and expense budgets — see Budgets & fees.

Add the people who’ll work on each phase so Monograph can staff the project and compare planned hours against logged time.

  1. On a phase, click Show assigned team to expand it.

  2. Use the + Assign team member dropdown to add a person. If they have a default role and rate, it fills in automatically; if not, you’ll be prompted to choose a role and billable rate.

  3. Enter planned hours for each team member — either a number of hours or a percent of the phase budget. These hours generate the person’s allocations in Staffing.

  4. To put someone on every phase, click the menu next to their name and choose Assign to all phases. You’ll still enter hours per phase.

On the Grow plan, creating a project from a template shows a banner with suggested team members for each open role, based on who has worked similar categories and roles before and who has availability.

  1. Review the suggestions. Use the dropdown to swap anyone out — the hours shown are each person’s available time over the project.

  2. Click Apply to add the selected people to every phase at the matching role and rate, or Dismiss to ignore them.

Open the Details page from the project sub-menu to store the rest of the project’s information. Much of it appears on the project’s Overview page and on invoices.

  • Basic info — name, number, color, project type, categories, and client. You can also add invoice recipients, the project address that appears on invoices, and free-form notes (a good place for payment method, project source, or retainer terms).
  • Project size — gross/net square footage and construction cost. See Budgets & fees.
  • Consultant collaboration — invite consultants to collaborate and set up bill reminders.
  • Share link — turn on a free, read-only link showing the project’s schedule (phases and milestones). It never exposes financial data, and you can switch it off anytime. See Phases & timeline.

Once a project is fully built out, save it as a template so you can reuse its phases, budgets, and roles on similar jobs. Templates are the fastest way to start your next project and are what unlock role recommendations.